Laos Phase I and Phase II Project was successfully put into operation, model DU1000-4500, 14 set belt vacuum filters. Read More
The Jindal Saw Bhilwara Site required a capacity on 2000TPD on Dry basis,80% pass 200mesh per day.Our machines operating very well and help the customer well reached the requested results. Read More
Project Name:DRC Thickener for Copper and Cobalt Application in Kimin SiteEquipment on Site: 2 Sets of 22m and 3 Sets of 18m High Rate ThickenersProject Finished Time:2020 Project Introduction:Toncin&Roytec Thickener reduced the original designed size with radflow feedwell technology, and helped cus Read More
Project Name:China Vacuum Belt Filter for Lop Nor Potash Fertilizer Project Equipment on Site:57 Sets of Belt Filter DU72-3200 Project Finished Time:2007 Project Introduction:Lop Nor Potash Fertilizer Project is the largest Vacuum Belt Filter use site in the world.The project of 1.2 million tons/ye Read More