Availability: | |
---|---|
Quantity: | |
TONCIN/Sunny
Product Introduction
Classification:
According to external form: pillow dam, slope dam, arch dam, spine dam, deflect dam.
According to medium: air filling dam and water filling dam
According to anchoring type: single and double anchor
The whole dam air bag strength
The whole dam airbag, also called none overlap joints dam airbag. It produce according to the whole manufacturing technology, which realized by the super large curing press and the patented technology of folding and curing the sulfide. The whole dam bag has no second time splicing and vulcanization process, and the tensile strength of all directions can be consistent, so there is no obvious weak part, which will improve the safety greatly. The service life is fully guaranteed.
4. Reduce the cost, and increase the investment and comprehensive social benefits.
Feature
Water retaining: By inflating the airbag, it supports the water shield shield to achieve water storage.
Water supply: When the water storage height exceeds the height of the water shield, the water flows through the shield, and the
airbag and support system are protected by the shield under the shield without receiving damage.
Dam height adjustment: Adjust the height and angle of the water shield by adjusting the air volume to control the height of the
water surface.
Product Introduction
Classification:
According to external form: pillow dam, slope dam, arch dam, spine dam, deflect dam.
According to medium: air filling dam and water filling dam
According to anchoring type: single and double anchor
The whole dam air bag strength
The whole dam airbag, also called none overlap joints dam airbag. It produce according to the whole manufacturing technology, which realized by the super large curing press and the patented technology of folding and curing the sulfide. The whole dam bag has no second time splicing and vulcanization process, and the tensile strength of all directions can be consistent, so there is no obvious weak part, which will improve the safety greatly. The service life is fully guaranteed.
4. Reduce the cost, and increase the investment and comprehensive social benefits.
Feature
Water retaining: By inflating the airbag, it supports the water shield shield to achieve water storage.
Water supply: When the water storage height exceeds the height of the water shield, the water flows through the shield, and the
airbag and support system are protected by the shield under the shield without receiving damage.
Dam height adjustment: Adjust the height and angle of the water shield by adjusting the air volume to control the height of the
water surface.
Air inflated rubber dam data
H(M) | pressure rate (in/out) | radial strength kN/m | model | thickness(mm) | safety factor |
1.0 | 1.00 | 5.00 | JBD1.0-080-3 | 10 | 45.00 |
1.5 | 1.00 | 11.25 | JBD1.5-100-3 | 10 | 20.00 |
2.0 | 1.00 | 20.00 | JBD2.0-120-3 | 10 | 13.50 |
2.5 | 1.00 | 31.25 | JBD2.5-160-3 | 10 | 11.52 |
3.0 | 0.90 | 40.50 | JBD3.0-200-3 | 12 | 11.11 |
3.5 | 0.80 | 49.00 | JBD3.5-220-3 | 12 | 10.10 |
Water inflated rubber dam data
H(M) | pressure rate (in/out) | radial strength kN/m | model | thickness(mm) | safety factor |
1.0 | 1.50 | 5.00 | JBD1.0-080-2 | 5.5 | 25.60 |
1.5 | 1.50 | 11.25 | JBD1.5-100-2 | 6.2 | 17.78 |
2.0 | 1.40 | 18.00 | JBD2.0-120-2 | 6.8 | 13.33 |
2.5 | 1.40 | 28.13 | JBD2.5-160-2 | 7.3 | 11.38 |
3.0 | 1.30 | 36.00 | JBD3.0-220-2 | 7.9 | 12.22 |
3.5 | 1.30 | 49.00 | JBD3.5-280-2 | 8.5 | 11.43 |
4.0 | 1.25 | 60.00 | JBD4.0-240-3 | 10.2 | 12.00 |
4.5 | 1.25 | 75.94 | JBD4.5-280-3 | 11.1 | 11.06 |
5.0 | 1.20 | 87.50 | JBD5.0-280-3 | 12.7 | 11.65 |
Air inflated rubber dam data
H(M) | pressure rate (in/out) | radial strength kN/m | model | thickness(mm) | safety factor |
1.0 | 1.00 | 5.00 | JBD1.0-080-3 | 10 | 45.00 |
1.5 | 1.00 | 11.25 | JBD1.5-100-3 | 10 | 20.00 |
2.0 | 1.00 | 20.00 | JBD2.0-120-3 | 10 | 13.50 |
2.5 | 1.00 | 31.25 | JBD2.5-160-3 | 10 | 11.52 |
3.0 | 0.90 | 40.50 | JBD3.0-200-3 | 12 | 11.11 |
3.5 | 0.80 | 49.00 | JBD3.5-220-3 | 12 | 10.10 |
Water inflated rubber dam data
H(M) | pressure rate (in/out) | radial strength kN/m | model | thickness(mm) | safety factor |
1.0 | 1.50 | 5.00 | JBD1.0-080-2 | 5.5 | 25.60 |
1.5 | 1.50 | 11.25 | JBD1.5-100-2 | 6.2 | 17.78 |
2.0 | 1.40 | 18.00 | JBD2.0-120-2 | 6.8 | 13.33 |
2.5 | 1.40 | 28.13 | JBD2.5-160-2 | 7.3 | 11.38 |
3.0 | 1.30 | 36.00 | JBD3.0-220-2 | 7.9 | 12.22 |
3.5 | 1.30 | 49.00 | JBD3.5-280-2 | 8.5 | 11.43 |
4.0 | 1.25 | 60.00 | JBD4.0-240-3 | 10.2 | 12.00 |
4.5 | 1.25 | 75.94 | JBD4.5-280-3 | 11.1 | 11.06 |
5.0 | 1.20 | 87.50 | JBD5.0-280-3 | 12.7 | 11.65 |
Advantages:
Rubber dam has the following characteristics compared with conventional sluice dam:
Advantages:
Rubber dam has the following characteristics compared with conventional sluice dam:
Service Support
Whole Technological Design
Toncin determines reasonable plans and selections by conducting more systematic laboratory tests, semi-industrialization tests and theoretical analysis calculations and adopting appropriate methods in light of the actual problems faced by customers. And it determines specific parameters through laboratory tests and semi-industrial tests.
Project Construction
Toncin can provide customers with integrated project services for its perfect project management system and experienced high-quality team and can also provide customers with its best services in achieving the ultimate project goal by carrying out the management work on the project quality, schedule, safety, cost, procurement, information files, organization and coordination etc. according to customer’s contractual documents. Toncin contracts the design, procurement, construction and trials etc. for the entire process or some certain stages of the construction project according to the contract and takes full liability for the quality, safety, duration and cost etc. of the contracted project.
Response Time and After-sales Services
If any failure due to a defect has occurred during the warranty period, our company has given the following response and promise: to respond within 12 hours and rush to the domestic scene within 72 hours. With a rigorous and efficient service architecture, diverse and flexible service and response means, Toncin is capable of providing response service up to 7* 24 hours to ensure that users can get help at any time during the warranty period.
Service Support
Whole Technological Design
Toncin determines reasonable plans and selections by conducting more systematic laboratory tests, semi-industrialization tests and theoretical analysis calculations and adopting appropriate methods in light of the actual problems faced by customers. And it determines specific parameters through laboratory tests and semi-industrial tests.
Project Construction
Toncin can provide customers with integrated project services for its perfect project management system and experienced high-quality team and can also provide customers with its best services in achieving the ultimate project goal by carrying out the management work on the project quality, schedule, safety, cost, procurement, information files, organization and coordination etc. according to customer’s contractual documents. Toncin contracts the design, procurement, construction and trials etc. for the entire process or some certain stages of the construction project according to the contract and takes full liability for the quality, safety, duration and cost etc. of the contracted project.
Response Time and After-sales Services
If any failure due to a defect has occurred during the warranty period, our company has given the following response and promise: to respond within 12 hours and rush to the domestic scene within 72 hours. With a rigorous and efficient service architecture, diverse and flexible service and response means, Toncin is capable of providing response service up to 7* 24 hours to ensure that users can get help at any time during the warranty period.